Context: Our contact at Triumph Modular reached out to us Friday evening, stating his company was going to be dropping a trailer at General RV in Birchrun this Saturday because they had had a flood in their sales building. This ramp was needed urgently to give access to the trailer to potential customers who were mobility impaired and needed to be installed on Monday morning.
The Constraint:Time was our biggest constraint in this scenario as we had to wait for the trailer to be dropped Saturday evening go up and take measurements Sunday and then install first thing in the morning at 8 AM on Monday.